Each service begins with what is installed, what documentation exists and where production is exposed.
Lifecycle
PLC & HMI Obsolescence Audits
We identify discontinued Siemens PLCs, Comfort Panels, drives and ageing control equipment, then assess replacement availability and the production risk each item carries.
Recovery
PLC & HMI Backup Audits
We locate missing source code, verify backups and recover programs where possible, then assess how ready your site is for a disaster recovery event.
Continuity
Industrial Disaster Recovery
We develop recovery plans that minimise factory downtime following a PLC, HMI or control system failure, so the route back to production is understood in advance.
Modernisation
PLC & HMI Retrofits
We replace obsolete Siemens panels with modern Unified HMIs, migrate existing projects and rebuild systems where source code is unavailable.
Discuss your control system requirements
Tell us which PLCs, HMIs or recovery gaps concern your plant and we will advise on the next step.